New Bathroom-Combi-boiler

Bathroom upgrade and Combination Boiler

  • Hot water cylinder removed, new Baxi Combi boiler installed in airing cupboard
    Hot water cylinder removed, new Baxi Combi boiler installed
  • Old Bathroom uninstalled
    Original Bathroom fittings removed and preparation work commenced
  • Old bath and tiling removed
    Old bath and tiling removed
  • Old radiator replaced with Towel Rail
    Old radiator replaced with Towel Rail
  • New bath installed with shower and new tiling
    New bath installed with shower and new tiling
  • Bathroom before and after
    Bathroom before and after

The customer required a new boiler and decided on a combi boiler. This was sited in the airing cupboard and the removal of the old hot water cylinder created space for a small radiator to aid to keep clothes warm and aired once the shelves were added.

The old bathroom was taken out and all the tiling removed, it was re-tiled, a new bathroom suite installed with a new shower head and the old radiator was replaced with a large towel rail.

The photo’s show some of the process. All that was left to do was a little painting around the door frame.

Comments are closed.