Shower Room

The images for this shower room installation start with the untouched existing installation and goes through the process of taking the walls down to bare block or plaster, progressing to each stage such as positioning the pipework for towel rail, wash basin and shower. The WC waste pipe was also modified so that it’s concealment used less space within the room. The installation required additional tradesmen to take care of the plastering and tiling. All plumbing is concealed giving a clean finish to the installation, making all the mess, rubble and upheaval worthwhile.

 

Shower room installation before work commenced, JC Plumbing Stoke on Trent

Before work commenced

Shower room installation, completed. JC Plumbing Stoke

Completed

 

 

 

 

  • Shower room project, start. JC Plumbing Stoke on Trent
    Project early stages
  • Shower room project, plumbing preparation. JC Plumbing Stoke on Trent
    Plumbing positioned, frame for boxing in fitted
  • Shower room project, this area plumbed ready for tiling. JC Plumbing Stoke on Trent
    This area plastered, plumbing concealed
  • Shower room project, shower area prepared for plastering. JC Plumbing Stoke on Trent
    Shower area, preparation for plastering
  • Shower room project, shower area plastered, all plumbing concealed . JC Plumbing Stoke on Trent
    Shower area preparation, now plastered and shower base positioned
  • Shower room project, tiling complete, ready for wash basin, shower unit to be installed. JC Plumbing Stoke on Trent
    Shower room plastered and tiled, all services concealed, ready for final installation
  • Shower room project, Complete shower installed, wash basin and WC. JC Plumbing Stoke on Trent
    The completed shower room
  • Shower room project, stylish wash basin area. JC Plumbing Stoke on Trent
  • Shower room project, shower room view. JC Plumbing Stoke on Trent