Shower Room 2

This project follows the familiar process of taking the room down to bare walls and floor. Old tiles removed and the walls and floor made good before refitting commences. The value of thorough preparation work is always rewarded as a project progresses and there is no shortcut.

The property owner decided to replace the old fittings with a modern matching WC and wash basin and the radiator was replaced with a practical towel rail. A new fully tiled shower cubical completed the suite.

It just remains for the owner to decide on the decor to add the finishing touches.

  • Shower before and after
    Complete shower room renovation. Old is on left.
  • Preparation work, left. Shower installed, right.
    Preparation work, left. Shower installed, right.
  • New WC before and after
    Before on left
  • Old wash basin, left. Preparation work, right.
    Old wash basin, left. Preparation work, right.
  • Wash basin fitted
    Tiled before installation
  • The completed shower room before decorating
    The completed shower room before decorating

Comments are closed.